News

05Dec

TIME LAPSE VIDEO: Chichester Free School

Take a couple of minutes to watch this fantastic time lapse video showing the progress at Chichester Free School where we are working alongside Farrans Construction to install the windows, doors and curtain walling.

Read More
01Dec

TIME LAPSE VIDEO: Eliot College Extension, University of Kent

Check out this time lapse video of our team installing Marley Eternit’s Equitone Tectiva rainscreen cladding panels on one of the elevations on the Eliot College extension at the University of Kent campus in Canterbury.

Read More
14Nov

Do your CIF bids need a boost?

The Department for Education has published details of the upcoming 2018-19 round of Condition Improvement Funding (CIF) which is open to Academies and sixth-form colleges.

Find out how our Facade Condition Survey and Report can give you a clearer view of the condition of the building’s facade including the current failings and performance limitations.

Read More
06Nov

PROJECT UPDATE: Fort Pitt Grammar School, Chatham

Our team have now finished installing Renson's continuous louvre system that houses the rooftop plant room on the new science block at Fort Pitt Academy.

Read More
02Nov

JUST RELEASED: Time lapse video shows glass installation at Haynes Ford Showroom in Maidstone

Check out our newly released time lapse video showing our team installing the glass units into Metal Technology's System 17 curtain walling profile at the Haynes Ford Showroom in Maidstone.

Read More
31Oct

PROJECT UPDATE - Walthamstow Hall School, Sevenoaks

Work is progressing well at the new science block and 6th Form Centre at Walthamstow Hall School in Sevenoaks as you can see by these photos sent in by Contracts Director Chris Jones.

Read More
30Oct

PROJECT COMPLETE: new teaching block at The Canterbury Academy

Following the success of the full facade refurbishment at the Canterbury Academy, we were back on site in early January to install the windows, doors and curtain walling on the new building.

Read More
16Oct

CASE STUDY: Eliot College Extension, University of Kent

The Eliot College extension is a two-storey administration building situated in ‘the heart’ of the University of Kent. Built in the 1980’s, the design of the building was similar to many others built on the campus around that time - including the original Eliot College building nearby.

The project was managed by DCB (Kent) Ltd and included upgrade works to mechanical and electrical systems as well as over-cladding the exterior and replacing the existing old defective metal sliding windows and wooden doors with a new, highly insulated, thermally broken system.

Following the tender process, Prima Systems were selected as the glazing and cladding partner for the project.

Read More
20Sep

Long-standing team members Adam Coleman and Chris Jones are promoted to the Board of Directors

Kent-based facade contractor Prima Systems (SE) Ltd has promoted two of its long-standing team members to the Board of Directors with the aim of driving business growth and profitability.

Adam Coleman and Chris Jones - who are both long-standing members of the team - have become Technical Sales Director and Contracts Director respectively.

Read More
01Sep

CASE STUDY: Prima’s support helps to secure CIF funding for facade transformation at Canterbury Academy

In November 2015 the team at The Canterbury Academy were preparing to submit their Condition Improvement Fund (CIF) bid application for improvements to the main building on campus. The Academy team enlisted the help of Modus Construction Consultants to help them define their requirements and compile the CIF application.

In order to strengthen the technical side of the application Modus requested a detailed façade investigation report from Prima Systems. This report assesses the condition of the existing façade and, where possible, provides advice on potential improvements. It also highlights any health and safety failings as well as non-compliant elements on the building.

Read More
Sign up to our newsletter